None

Recent failures

Failed In Fixed In Time Taken To Fix
#212 Code changes detected

Currently failing
#210 Code changes detected

#211 Code changes detected

1 build

2 days, 17 hours, 47 minutes

#200 Code changes detected

#208 Code changes detected

8 builds

4 days, 7 hours, 45 minutes

#197 Code changes detected

#198 Code changes detected

1 build

4 hours, 41 minutes

#192 Code changes detected

#195 Code changes detected

3 builds

1 day, 7 hours, 23 minutes

  • Average time to fix a failure: 2 days, 3 hours, 26 minutes
  • Average number of builds between fixes: 3 builds
  • The longest time taken to fix a failure is 4 days, 7 hours, 45 minutes, from failure starting in build #200.
  • The greatest number of builds taken to fix a failure is 8, from failure starting in build #200.