None

Recent failures

Failed In Fixed In Time Taken To Fix
#341 Code changes detected

#343 Code changes detected

2 builds

19 hours, 30 minutes

#339 Code changes detected

#340 Code changes detected

1 build

3 hours

#337 Code changes detected

#338 Code changes detected

1 build

3 hours, 30 minutes

#334 Code changes detected

#336 Code changes detected

2 builds

2 days, 22 hours, 49 minutes

#330 Code changes detected

#333 Code changes detected

3 builds

1 day, 2 hours, 49 minutes

#321 Code changes detected

#327 Code changes detected

6 builds

1 week, 1 day, 9 minutes

  • Average time to fix a failure: 2 days, 4 hours, 38 minutes
  • Average number of builds between fixes: 2.5 builds
  • The longest time taken to fix a failure is 1 week, 1 day, 9 minutes, from failure starting in build #321.
  • The greatest number of builds taken to fix a failure is 6, from failure starting in build #321.