None

Recent failures

Failed In Fixed In Time Taken To Fix
#169 Code changes detected

#186 Code changes detected

17 builds

1 week, 4 days, 5 hours, 42 minutes

#165 Code changes detected

#168 Code changes detected

3 builds

2 days, 7 hours, 54 minutes

#162 Code changes detected

#164 Custom build by Eric Milles with revision v3.6.0

2 builds

3 days, 20 hours, 6 minutes

  • Average time to fix a failure: 5 days, 19 hours, 14 minutes
  • Average number of builds between fixes: 7.33 builds
  • The longest time taken to fix a failure is 1 week, 4 days, 5 hours, 42 minutes, from failure starting in build #169.
  • The greatest number of builds taken to fix a failure is 17, from failure starting in build #169.