None

Recent failures

Failed In Fixed In Time Taken To Fix
#433 Code changes detected

Currently failing
#428 Code changes detected

#431 Code changes detected

3 builds

5 days, 23 hours, 59 minutes

#426 Code changes detected

#427 Code changes detected

1 build

6 days

#423 Code changes detected

#425 Code changes detected

2 builds

2 days, 1 second

#421 Code changes detected

#422 Code changes detected

1 build

3 days

#414 Code changes detected

#420 Code changes detected

6 builds

1 week, 1 day, 1 second

  • Average time to fix a failure: 4 days, 11 hours, 43 minutes
  • Average number of builds between fixes: 2.17 builds
  • The longest time taken to fix a failure is 1 week, 1 day, 1 second, from failure starting in build #414.
  • The greatest number of builds taken to fix a failure is 6, from failure starting in build #414.