None
Recent failures
Failed In | Fixed In | Time Taken To Fix | ||
---|---|---|---|---|
#396 |
Code changes detected
|
#397 |
Code changes detected
|
1 build 1 day, 2 seconds |
#383 |
Code changes detected
|
#389 |
Code changes detected
|
6 builds 6 days, 21 hours, 59 minutes |
- Average time to fix a failure: 3 days, 22 hours, 59 minutes
- Average number of builds between fixes: 3.5 builds
- The longest time taken to fix a failure is 6 days, 21 hours, 59 minutes, from failure starting in build #383.
- The greatest number of builds taken to fix a failure is 6, from failure starting in build #383.