None

Recent failures

Failed In Fixed In Time Taken To Fix
#650 Code changes detected

#653 Code changes detected

3 builds

1 day, 5 hours, 20 minutes

#648 Code changes detected

#649 Code changes detected

1 build

18 hours, 19 minutes

#645 Code changes detected

#647 Code changes detected

2 builds

1 day, 1 hour, 49 minutes

#629 Code changes detected

#644 Code changes detected

15 builds

1 week, 5 days, 4 hours, 4 minutes

  • Average time to fix a failure: 3 days, 19 hours, 23 minutes
  • Average number of builds between fixes: 5.25 builds
  • The longest time taken to fix a failure is 1 week, 5 days, 4 hours, 4 minutes, from failure starting in build #629.
  • The greatest number of builds taken to fix a failure is 15, from failure starting in build #629.