None

Recent plan failures

Failed In Fixed In Time Taken To Fix
#7 Changes by Spring Operator <[email protected]>

#8 Changes by Artem Bilan

1 build

6 minutes

  • Average time to fix a failure: 6 minutes
  • Average number of builds between fixes: 1 builds
  • The longest time taken to fix a failure is 6 minutes, from failure starting in build #7.
  • The greatest number of builds taken to fix a failure is 1, from failure starting in build #7.