2.2.x
None

Recent plan failures

Failed In Fixed In Time Taken To Fix
#30 Changes by Spring Operator <spring-operator@users.noreply.github.com> and Josh Cummings

#32 Changes by Josh Cummings

2 builds

36 minutes

  • Average time to fix a failure: 36 minutes
  • Average number of builds between fixes: 2 builds
  • The longest time taken to fix a failure is 36 minutes, from failure starting in build #30.
  • The greatest number of builds taken to fix a failure is 2, from failure starting in build #30.