Reactor Addons NEXT

Next Gen Reactor Addons
None

Test Summary

This page summarises information for smokeTestDelay in test class ForkJoinPoolSchedulerTest.

Details

Test Class
reactor.scheduler.forkjoin.ForkJoinPoolSchedulerTest
Test
Smoke test delay
Last ran
Successful #3012 (Code changes detected – )
First ran
#2931
Failures
1
Successes
76
Passing since
#2996 (Manual run by Stephane Maldini)

Test Statistics

98%Successful

Successful jobs:
76 / 77
Average Duration:
2 seconds

Recent Failures

Failed In Fixed In Time Taken To Fix
#2995 Code changes detected

#2996 Manual run by Stephane Maldini

1 build

8 minutes

The following failure information is for last 25 builds:

  • Average time to fix test when failed: 8 minutes
  • Average number of builds between fixes: 1 build(s)