None

Recent failures

Failed In Fixed In Time Taken To Fix
#230 Code changes detected

Currently failing
#228 Code changes detected

#229 Code changes detected

1 build

1 day, 23 hours, 41 minutes

#224 Code changes detected

#225 Manual run by Soby Chacko

1 build

2 days, 1 hour, 43 minutes

#205 Code changes detected

#213 Manual run by Trevor Marshall

8 builds

3 weeks, 5 days, 22 hours, 45 minutes

  • Average time to fix a failure: 48 weeks, 3 days, 4 hours, 50 minutes
  • Average number of builds between fixes: 2.5 builds
  • The longest time taken to fix a failure is 3 years, 33 weeks, 2 days, 19 hours, 12 minutes, from failure starting in build #230.
  • The greatest number of builds taken to fix a failure is 8, from failure starting in build #205.