None

Recent plan failures

Failed In Fixed In Time Taken To Fix
#12 Changes by Mark Pollack

#14 Manual run by Mark Pollack

2 builds

4 minutes

#6 Changes by Spring Buildmaster

#8 Manual run by Mark Pollack

2 builds

47 minutes

#2 Changes by Mark Pollack

#3 Manual run by Mark Pollack

1 build

2 minutes

  • Average time to fix a failure: 18 minutes
  • Average number of builds between fixes: 1.67 builds
  • The longest time taken to fix a failure is 47 minutes, from failure starting in build #6.
  • The greatest number of builds taken to fix a failure is 2, from failure starting in build #6.