4.3.x

None

Recent failures

Failed In Fixed In Time Taken To Fix
#646 Rebuilt by Sam Brannen

#647 Code changes detected

1 build

1 day, 17 hours, 12 minutes

#640 Code changes detected

#642 Code changes detected

2 builds

2 days, 23 hours, 26 minutes

  • Average time to fix a failure: 2 days, 8 hours, 19 minutes
  • Average number of builds between fixes: 1.5 builds
  • The longest time taken to fix a failure is 2 days, 23 hours, 26 minutes, from failure starting in build #640.
  • The greatest number of builds taken to fix a failure is 2, from failure starting in build #640.