None

Recent plan failures

Failed In Fixed In Time Taken To Fix
#26 Manual run by Trevor Marshall

#28 Manual run by Glenn Renfro

2 builds

1 hour, 2 minutes

#23 Changes by Gunnar Hillert

#24 Changes by Mark Pollack

1 build

25 minutes

#15 Changes by Spring Buildmaster

#16 Changes by Spring Buildmaster

1 build

1 hour, 14 minutes

#11 Changes by Mark Pollack

#12 Manual run by Mark Pollack

1 build

46 minutes

  • Average time to fix a failure: 52 minutes
  • Average number of builds between fixes: 1.25 builds
  • The longest time taken to fix a failure is 1 hour, 14 minutes, from failure starting in build #15.
  • The greatest number of builds taken to fix a failure is 2, from failure starting in build #26.