None

Recent failures

Failed In Fixed In Time Taken To Fix
#188 Code changes detected

Currently failing
#169 Code changes detected

#186 Code changes detected

17 builds

1 week, 4 days, 5 hours, 42 minutes

  • Average time to fix a failure: 1 week, 2 days, 16 hours, 11 minutes
  • Average number of builds between fixes: 11 builds
  • The longest time taken to fix a failure is 1 week, 4 days, 5 hours, 42 minutes, from failure starting in build #169.
  • The greatest number of builds taken to fix a failure is 17, from failure starting in build #169.