None

Recent failures

Failed In Fixed In Time Taken To Fix
#579 Code changes detected

Currently failing
#556 Code changes detected

#577 Code changes detected

21 builds

2 weeks, 3 days, 23 hours, 32 minutes

  • Average time to fix a failure: 1 week, 2 days, 20 hours, 32 minutes
  • Average number of builds between fixes: 11 builds
  • The longest time taken to fix a failure is 2 weeks, 3 days, 23 hours, 32 minutes, from failure starting in build #556.
  • The greatest number of builds taken to fix a failure is 21, from failure starting in build #556.