None

Recent plan failures

Failed In Fixed In Time Taken To Fix
#127 Changes by Gary Russell

#128 Changes by Artem Bilan

1 build

5 minutes

#125 Changes by Spring Buildmaster

#126 Code changes detected

1 build

24 minutes

#120 Changes by Gary Russell

#121 Changes by Artem Bilan

1 build

11 minutes

  • Average time to fix a failure: 14 minutes
  • Average number of builds between fixes: 1 builds
  • The longest time taken to fix a failure is 24 minutes, from failure starting in build #125.
  • The greatest number of builds taken to fix a failure is 1, from failure starting in build #120.