None
Recent plan failures
Failed In | Fixed In | Time Taken To Fix | ||
---|---|---|---|---|
#7853 |
Changes by Rossen Stoyanchev
|
Currently failing | ||
#7841 |
Changes by Sam Brannen
|
#7842 |
Manual run by Sam Brannen
|
1 build 11 minutes |
#7834 |
Changes by Sébastien Deleuze
|
#7836 |
Changes by Brian Clozel
|
2 builds 3 hours, 11 minutes |
- Average time to fix a failure: 4 weeks, 5 days, 17 hours, 58 minutes
- Average number of builds between fixes: 2.67 builds
- The longest time taken to fix a failure is 14 weeks, 3 days, 2 hours, 33 minutes, from failure starting in build #7853.
- The greatest number of builds taken to fix a failure is 5, from failure starting in build #7853.